
01 · Plan the operation
Put workflow and service demand ahead of the equipment list.
The menu, capacity and staffing model define the cooking, preparation, refrigeration and wash-up zones. Those zones then inform equipment footprints and service loads.
- Menu, output and production sequence
- Equipment dimensions, access and clearances
- Extraction, power, water, drainage and refrigeration needs
Discuss a project

